Big Day for the Boatworks

Monday October 10, was a big day for LAMP Boatworks. We installed the finished centerboard trunk in the Bevin’s Skiff, (our first building project, see blog To Build A Boat, August 2, 2007), made considerable progress fashioning the oars, built some sawhorses, and assembled a new tent effectively doubling our workspace. Jim Gaskins has spent considerable time meticulously fashioning the centerboard trunk. This piece is critical since it holds the centerboard to provide stability under sail but more importantly, has to be robustly built in order to absorb the shock transmitted to it through the centerboard during grounding events. The correct installation of this structure is also of great importance since it’s through the hull and subject to leaking if not properly done.

DSC08871B.jpg

This picture shows the centerboard trunk on its side prior to installation. Note the slot in the bottom of the boat for the centerboard.


DSC08888B.jpg


Pilot holes for brass screws were drilled through the bottom of the boat.


DSC08901B.jpg


Then the centerboard trunk was clamped in place through the trunk, the boat placed upside down, and the assembly dry fitted with a number of brass screws lubricated with beeswax run through the pilot holes.


DSC08906B.jpg


The above picture shows the completed dry fitting and the centerboard - the work of Eli Subin. Dry fitting is an important step in critical assembly processes. Whenever two timbers are assembled together using screws, sawdust and wood debris will find its way between the timbers affecting the quality of the joinery.


DSC08907B.jpg


After the dry fitting, the structure is disassembled and sanded to remove all wood debris and splinters. Then the area is masked off and prepared for final assembly.


DSC08916B.jpg


Maury Keiser has applied an adhesive to the bottom of the centerboard trunk. The masking tape will prevent it from squeezing out all over the bottom of the boat.


DSC08918B.jpg


The centerboard trunk is then installed into the slot.


DSC08929B.jpg


Jim Gaskins fastens the centerboard trunk in place from below with the brass screws used in dry fitting.


DSC08937B.jpg


The centerboard trunk end-blocks are then installed with adhesive and screws.


DSC08939B.jpg


The boat is then turned over and adhesive applied to insure a waterproof seal around the centerboard trunk.


DSC08941B.jpg


Finally, the boat is turned over again and the assembly left to dry and set. Here Eli has a good look at the finished installation.

The shaping of the oars went on at the same time the centerboard trunk was being installed.


DSC08875B.jpg


The oars have been in the works for some time and have received a good deal of shaping as can be seen in the above photo. Now the final shaping begins using planes and spoke shaves.


DSC08880B.jpg


A jig was made to hold the oars while shaping. It’s much easier to get a good shape if your oar is not moving about on the workbench. Here Maury Keiser is cutting a block for the jig with a Japanese saw.


DSC08883B.jpg


The blocks that make the jig were screwed into the workbench surface. Here you can see the oar in place and ready to work.


DSC08898B.jpg


Finally, a weighted bag is placed on top of the gig to lock the oar in place. Now the shaping can begin.


DSC08900B.jpg


Ralph Higgins, one of the latest volunteers to join the boat builders is planning the oar.


DSC08902B.jpg


Maury Keiser has a go at it with a spoke shave.


DSC08905B.jpg


And then more planing.


DSC08894B.jpg


While all this was going on Dave Huber and Allan Moskowitz used the chop saw to cut lumber for a pair of saw horses being assembled.

As the morning wore on we decided to set up the new tent. Rich, Ray, and Heather of the Lighthouse staff helped with the effort.


DSC08943B.jpg


The numbered pieces were laid out in the proper order and fit together.


DSC08947B.jpg


Then the tent support structure was raised and pinned together.


DSC08957B.jpg


Finally the tent canvas was setup in place and the mulch was raked flat. With that the LAMP Boatworks’ working space doubled.


DSC08958B.jpg


This is the new expanded workspace at the end of the day's work session. The Bevin’s skiff will move into the new space after final assembly for painting and any other necessary finishing work. The lap-strake skiff will be moved into the shop tent for the fitting and installation of its frames.

It was a good day all in all. The Boatworks volunteers are becoming a very productive and fun team whose skills are continually increasing preparing the Boatworks for future and more complex building projects.

Comments (3)

I've built two boats at Wooden Boat School in Brooklin, Maine. The pictures of the center board well were like a flash back to the Shell Back Dingy & the oars were a flash to the paddles for my Wee Lassie. How often do you build boats at the light station? Are volunteers needed?

Hi! Carol, I thought I'd answer for Sam. I just saw this and it may take a bit to get a response.

We have an ongoing and regular boat building program at the Lighhtouse/LAMP. The desire is to preserve the traditional techniques. It's Sam's baby and he can tell you days of the week, etc.

As you can see it's a new program, but it is catching on. Yes, volunteers are welcome. To volunteer, Contact Debe Thompson at the St. Augustine Lighthouse & Museum, Inc. 904 829-O745.

If you come in, come with tales about Maine. We love that lighthouse state. And we'd love to hear about your boat building experience.

Warmly,
Kathy Fleming
Executive Director
St. Augustine Lighthouse

Hi Carol,

Our boatbuilding program is pretty much brand new, and the skiff is our first project. We hope to always have a boat construction project in the works, and the program is virtually entirely volunteer-driven, so we are always looking for folks to help out (especially if you have some wooden boatbuilding experience). Eventually we'd like to build a collection of watercraft representative of St. Augustine's unique and multi-cultural history as our nation's oldest port. For example, we are hoping to replicate some Spanish "chalupas" excavated by archaeologists and dating to St. Augustine's 1565 founding in time for the city's 450th anniversary in 2015.

If you want to get involved, contact our volunteer coordinator, Debe Thompson, at 904-829-0745, or email her at dthompson@staugustinelighthouse.com.

Thanks for commenting,

Chuck (LAMP Director)